logo

HomePerformancePerformance

Performance

No Project Name Customer ContractDate Project summary
/Equipment
29 Construction of a dryer room and installation of a measurement equipment system LG Electronics 2015.08 Hot and cold water tank, data collection system
28 [RPP2] Installation and demolition service of a performance tester Doosan Heavy Industries and Construction / Saudi Arabia 2015.04 DAS, flowmeter, transmitter, power meter, thermocouple
27 [Raipur] Inspection and calibration of a performance test material Doosan Heavy Industries and Construction / India 2015.04 DAS, flowmeter, transmitter, power meter
26 Relocation of the Dynamo facilities of the Korea Automotive Technology Institute Korea Automotive Technology Institute 2015.03 Heavy transportation and installation of a Dynamo system
(50 kW, 10,000 rpm, Siemens Drive)
25 Yaw drive durability evaluation test system Woorim Machinery 2015.03 Dynamo system (vector motor 5.5 kW, LS iS7 Drive)
24 EV Motor Dynamo Kookmin University Industrial–Educational Cooperation Group 2015.02 Dynamo system (50 kW, 10,000 rpm, Siemens Drive)
23 Battery test
Dynamo system
Samsung SDI 2015.02 Dynamo system (15 kW, 10,000 rpm, Siemens Drive)
22 Ain Sokhna PJT CEMS spare part (calibration gas) Doosan Heavy Industries and Construction / Egypt 2015.01 CEMs, O2 analyzer
21 [Performance test]
Repair and maintenance of a performance test equipment with BG
Doosan Heavy Industries and Construction 2015.01 WT3000, CW240
20 [MD2] Standard gas purchase Doosan Heavy Industries and Construction 2014.12 O2/CO2/CO standard gas
19 EV Dynamo DAS upgrade Korea Electrotechnology Research Institute 2014.12 Dynamo system (DAS, LabVIEW)
18 50 kW integrated environmental chamber Dynamo system Korea Electronics Technology Institute 2014.12 Dynamo system (50 kW, Siemens Drive)
17 15 kW integrated environmental chamber Dynamo system Korea Electronics Technology Institute 2014.12 Dynamo system (15 kW, Siemens Drive)
16 1 kW integrated environmental chamber Dynamo system Korea Electronics Technology Institute 2014.12 Dynamo system (1 kW, Siemens Drive)
15 [Ain Sokhna]
Outsourcing service for installation, demolition of a performance test material
Doosan Heavy Industries and Construction / Egypt 2014.1 DAS, flowmeter, transmitter, power meter, thermocouple
14 [Ain Sokhna]
Outsourcing service for purchase, inspection and calibration of a performance test material
Doosan Heavy Industries and Construction / Egypt 2014.1 DAS, flowmeter, transmitter, power meter, thermocouple
13 Installation, test drive, and education for the smart crops management system Jinju Sugok Deockcheon Agricultural Association 2014.1 EC/PH meter (iREA), radio repeater (iREA)
12 Wave power simulator of the Korea Electronics Technology Institute Korea Electronics Technology Institute 2014.1 Dynamo system (30 kW, MG, Siemens Drive)
11 PM human power and environmental description tester Gyeongbuk Hybrid Technology Institute 2014.06 MX100, MX110 (Yokogawa)
10 Integrated monitoring system for ESS performance evaluation facilities Korea Electrotechnology Research Institute 2014.05 WT3000, WT1800, MX100 (Dewetron, Signaltec)
9 Transients measurement, analyzer and integrated installation work for ESS performance evaluation Korea Electrotechnology Research Institute 2014.05 WT3000, WT1800, MX100 (Dewetron, Signaltec)
8 Performance evaluation system of the high-speed electric vehicle drive propulsion module Korea Electrotechnology Research Institute 2014.03 Power analysis system (Yokogawa, Dewetron)
7 Dynamo equipment removal Hyundai WIA 2014.03 Heavy transportation and installation of the Dynamo system (15 kW, 10,000 rpm, Siemens Drive)
6 Installation, test drive, and education of the All-in-one system LG Electronics 2013.12 Measuring and monitoring of air conditioner noise, speed, stress, temperature, current, pressure, and vibration in the chamber
5 Performance evaluation system of the 250 kW–class electric vehicle drive motor Korea Electrotechnology Research Institute 2013.12 Dynamo system (250 kW, 1,500 rpm, Unico Drive)
4 Small booster pump tester Wilo Pump 2013.09 Configuration, installation, and education of the system (iREA)
3 Automation system of the pump performance test Wilo Pump 2013.07 Configuration, installation, and education of the system (iREA)
2 Performance evaluation system of the 150 kW–class electric vehicle drive motor Korea Electrotechnology Research Institute 2012.12 Dynamo system (150 kW, 1,500 rpm, Unico Drive)
1 Performance evaluation system of the electric vehicle derive motor Korea Electrotechnology Research Institute 2011.07 Dynamo system (60 kW, 1,500 rpm, Unico Drive)